| Power Sector at a Glance
"ALL INDIA"
As on 31-01-2013
Source:CEA |
|
|
|
|
|
|
| 1.Total Installed Capacity: |
Power for All by 2013 |
|
| Sector |
MW |
%age |
| State Sector |
86,343.35 |
40.77 |
| Central Sector |
62,963.63 |
29.73 |
| Private Sector |
62,459.24 |
29.49 |
| Total |
2,11,766.22
|
|
|

|
|
| Fuel |
MW |
%age |
| Total Thermal |
141713.68
|
66.91
|
Coal |
121,610.88 |
57.42 |
Gas |
18,903.05 |
8.92 |
Oil |
1,199.75 |
0.56 |
| Hydro
(Renewable) |
39,416.40 |
18.61 |
| Nuclear |
4,780.00 |
2.25 |
| RES** (MNRE) |
25,856.14 |
12.20 |
| Total |
2,11,766.22
|
100.00 |
Renewable Energy Sources(RES) include SHP, BG, BP, U&I and Wind Energy
SHP= Small Hydro Project ,BG= Biomass Gasifier ,BP= Biomass Power,
U & I=Urban & Industrial Waste Power, RES=Renewable Energy Sources
Note:-
The Hydro generating stations with installed capacity less than or equal to 25 MW are indicated under RES.
The installed capacity in respect of RES is as on 31.10.2012 and is
based on MNRE email of dated 20.11.2012 where cumulative Grid interactive
power installed capacity has been indicated as 25409.33 MW. Reconciliation
of installed capacity of Hydro capacity resulted in transfer of 135 MW
from conventional to SHP-RES and retrieval of installed capacity of 67.20
from SHP-RES to conventional Hydro has resulted in net addition of 67.8
MW to SHP under RES. Also 30 MW of capacity in the nature of Waste Heat
Recovery Power Plant at Goa Energy Private Limited under U&I category
of RES has been added.The installed capacity due to wind and small hydro
amounting to 508.67 MW appearing in captive capacity has been deducted
to arrive at installed capacity of utilities in respect of RES.(26267.01-508.67+67.8+30=25856.14).
10% of the Installed capacity of Pragati CCGT which is indicated to be Merchant Power by IRP Div has been included in I/C of Delhi State Sector.
The Vijeshwaram CCPP of 272 MW Installed capacity has been included as an IPP in the state of Andhra Pradesh.
Unit No 3 of Satpura T P S of MPPGCL of 62.5 MW capacity has been
retired w.e.f 01.10.2012 during the month of January , 2013.
The Obra TPS Unit No 6 derated capacity 94 MW of UPRVUNL and Units
No 1 & 2 of Nasik TPS of derated capacity 125 MW of MAHAGENCO were retired
in June 2012.
With the commissioning of 3rd unit in the month of Oct 2012, the share
of first three units ( of 800MW) each of MUNDRA UMPP Station (5x800MW)(Gujarat)
have been divided amongst the states of U.P., Punjab, Haryana, Rajasthan,
Gujarat & Maharashtra in quatam as 180, 270, 225, 225, 1110 & 390 MW respectively ( as per intimation received from IRP Div, vide letter No CEA/PLG/IRP/1/12/2194 Dt. 08.10.2012 )
& not in the state of Gugarat alone as a whole as was being done earlier.
Figures at second place of decimal may not tally due to rounding off.
|