| Generation Short Term Measures
|
|
|
|
|
|
|
|
1.Generation Short Term Measures
Target during XIth PlAN
 |
Central Sector |
21,222 MW (34%) |
 |
State Sector |
21,355 MW (34%) |
 |
Private Sector |
19,797 MW (32%) |
| |
Total |
62,374 MW |
Commissioned
upto 15-03-2011
 |
Central Sector |
8,750 MW |
 |
State Sector |
12,971 MW |
 |
Private Sector |
11,041 MW |
| |
Total |
32,762 MW |
| Capacity addition, Planwise |
| VIth |
- 14,226 MW |
| VIIth |
- 21,401 MW |
| VIIIth |
- 16,422 MW |
| IXth |
- 19,015 MW |
| Xth |
- 21,180 MW |
| XIth (upto 15.03.2011) |
- 32,762 MW |
|
2.Strengthened Monitoring mechanism
- Monthly review by Chaiperson, CEA
- Reviews by Secretary (P)
- Review by Advisory Group under the Chairmanship of Hon'ble Minister
of Power
- Monitoring by Power Project, Monitoring Pannel on regular basis
- Regular interministerial reviews with MNRE / Coal / P&NG / Environment
& Forest
- Reviews with State Governments
- Construction cycle time compressed
- Setting bench marks in Project Management
3. Renovation & Modernization
- Hydro
- Under the hydro R&M programme, 65 (15 in Central Sector and 50 in State Sector)
hydro electric schemes (13 upto the VIIIth Plan, 20 in the IXth Plan & 32 in the Xth Plan)
with an installed capacity of about 10511 MW at a cost of about Rs. 1730 crores have been completed by
the end of the Xth Plan (i.e by 31st March 2007) & have accrued a benefit of
2351 MW through Life Extension, Uprating and Restoration
For the XIth Plan (2007-12), a total of 57 hydro R&M schemes (Revised from earlier
programmed 60 schemes) having an installed capacity of about 10716 MW at an estimated
cost of Rs. 4122 Crores were programmed to accrue a benefit of about 4123 MW through Life
Extension, Uprating and Restoration. Out of 57 schemes, till date only 2 schemes (1 in Central
Sector and 1 in State Sector) with an installed capacity of 134 MW at a cost of about Rs. 35
Crs. have been completed and has accrued a benefit of 50 MW through Life Extension &
Uprating and 28 schemes are Ongoing. The balance 27 schemes are under various stages of
implementation i.e. under Tendering, DPR preparation / finalization and RLA Studies.
CLICK HERE for Complete File
- Thermal
During the 11th Plan, 81units with a total capacity 13,032 MW are programmed to be taken up for LE. Another 77 units with a capacity of 19,205 MW would be taken up for R&M to sustain their performance.
The salient features of the programme:-
| Sl. No.
|
Particulars |
R&M |
LEP |
| (i) |
Number of thermal power stations |
22 |
31 |
| (ii) |
Number of thermal units |
77 |
81 |
| (iii) |
Estimated Cost |
Rs. 4125 Crores |
Rs.13405 Crores |
| (iv) |
Total capacity involved |
19,205 MW |
13,032 MW |
CLICK HERE for Complete File
|
| |
| |