Uttar Pradesh is committed to reforming its power sector with a view
to providing commercial viability and quality power at affordable rates
to all its citizens.
The Govt. of U.P. is undertaking its reform programme with vigour. The
Govt. of UP has already taken the following notable steps in this direction:-
- It has enacted its own Reform Act and is implementing it.
- The State Electricity Regulatory Commission has been vested with full
powers under the State Reforms Act.
- The State Electricity Board has been unbundled and its activities,
assets and staff have been transferred to the UPRVUNL, UPJVNL and UP Power
Corporation.
- The distribution business of Kanpur has been handed over to the Kanpur
Electric Supply Company (KESCO).
- The Govt. of UP has taken the bold step of writing off of Rs.19,000
crores of liabilities of the erstwhile UP State Electricity Board with
a view to starting the new companies created after unbundling with healthy
balance sheets.
- With the above UP has now acquired the position of a front-runner in
the reform process in the power sector in the country.
This Memorandum of Understanding between the Ministry of Power, GOI and
the Government of UP sets out the steps that the Government of U.P. will
undertake in a time bound manner to further the process of reform and
restructuring and the support which the GOI would give to the Govt. of
U.P.
II. REFORM PROGRAMME
OF UTTAR PRADESH
- UP would undertake segregation of transmission and distribution functions
within UPPCL.
- Undertake Energy Audit at all levels in order to reduce system losses.
This would be done in a time bound manner with the following milestones:-
i) Installation of metering at all 11 KV feeders by 30th September, 2000.
ii) 100% metering of all consumers by 31st December, 2001.
iii) On line billing at 20 selected towns through computerisation by
31st March, 2001.
- Formation of distinct distribution profit centres. Separate commercial
accounts/shadow Balance Sheets for such centres would be prepared from
31.3.2000.
- Achieve commercial viability in distribution.
- If commercial viability in distribution is not achieved UP Government
will privatise distribution.
- State Government would give full support to the State Electricity
Regulatory Commission to discharge its statutory responsibility.
III. SUPPORT FROM
GOVERNMENT OF INDIA
RENOVATION AND MODERNISATION OF THERMAL GENERATING STATIONS
- For the Renovation and Modernisation of thermal power stations of
Obra, Panki, Harduaganj, Parichha and Anpara A, PFC would finance the
UPRVUNL for this purpose. Financing would be subject to submission of
project reports to PFC and these being found viable. This is estimated
to cost Rs.2000 crores.
R&M of Hydro Electric Stations
- For R&M of hydro generating stations, the requirement of funds
is estimated at Rs.300 crores. PFC will provide assistance subject to
the projects submitted by UPJVNL being found viable.
TRANSMISSION
- For undertaking critical transmission and sub-transmission lines an
expenditure of Rs.700 crores is estimated. Specific projects would be
funded by PFC subject to these projects being commercially viable.
FINANCING
- In recognition of Uttar Pradesh being a reforming State, Power Finance
Corporation would be prepared to finance its investment needs in relaxation
of normal conditionalities relating to exposure limit, ROR and DSCR.
- Studies for reforms and restructuring would be funded by PFC through
grants and interest free loans.
- For R&M of generating stations, sub-transmission and distribution
financing would include an element of grant and lending at concessional
rates to the extent feasible in recognition of UP as a pioneer reforming
state.
- For metering of all consumers by December 2001 and computorised on
line billing the requirement of funds is estimated at Rs.650 crores.
PFC would provide funding on concessional terms for this purpose.
STRUCTURAL ADJUSTMENT
- Taking note of the need for structural adjustment financing for successful
completion of reforms, Ministry of Power would fully assist Uttar Pradesh
in raising funds for this purpose from financial institutions and other
sources.
HYDRO POWER DEVELOPMENT
- The Maneri Bhali Phase II (304 MW) and Lakhwar Viyasi (420 MW) hydroelectric
projects would be taken up and completed as joint venture projects between
the NHPC and UPJVNL. The investments already incurred by UP would be
treated as their share in the Joint Venture. Power from these two projects
would be fully committed to UP and would be allocated to the distribution
centres/companies which emerge through the reform process in UP and
have the capacity to pay for this power.
- Similarly, the hydro-electric power potential of Bhagirathi basin
would be fully developed as a joint venture.
THERMAL POWR DEVELOPMENT
- For the Anpara C(1000 MW) thermal project, the Ministry of Power
would assist UPRVUNL in arranging financing for the project estimated
to cost Rs.3500 crores.
RURAL ELECTRIFICATION
- In order to accelerate the rural electrification programme REC would
provide the requisite funds. To the extent necessary rescheduling of
past loans would be undertaken.
ADDITIONAL ALLOCATION OF POWR FOR DISTRIBUTION
- The Govt. of India would allocate additional power from new central
sector generating stations directly to the commercially viable distribution
centres/companies that emerge through the reform process and which demonstrate
their capacity to pay for the power they need.
III .IMPLEMENTATION:
- Implementation of the MOU would be monitored every three months.
- This Memorandum of Understanding will be for a period of five years,
and will be subject to review annually.
- Through this Memorandum of Understanding, both parties affirm their
commitment to fulfil the reform activities and achieve the objectives
mutually agreed upon in this Memorandum.
Signed this day the 25th of February, 2000 at New Delhi.
|
For and on behalf of
|
For and on behalf of
|
|
Government of U.P.
|
Government of India
|
|
(YOGENDRA NARAIN)
|
(V.K. PANDIT)
|
|
Chief Secretary
|
Secretary
|
|
Govt. of U.P.
|
Government of India
|
|